Owner: Orange County, FL
Public Works Department
4200 Whitcomb Avenue
Client: Hunton Brady Architects
201 S. Orange Avenue, Suite 500
Orlando, FL 32801
Mr. Steve Bellflower, POC
Cost: $ 9 Million
Completion Date: 2005
We provide MEP & FP Design Services to support the modification requirements the Owner and tenants of the new Amway Center. Following the project opening, AED was selected to provide Continuing MEP/ HVAC / FP Engineering Services for the entire project. The new facility includes 18,500 regular seats for NBA games (up from 17,461 in the old arena) and amenities including a variety of suite types as well as restaurants, concessions, bars, locker rooms, dressing rooms, ticket facilities, concessions, and retail spaces.. Additionally, the new Amway Center boasts 38 Founders Suites, 30 Presidents Suites, two Legends Suites, 70 Loge Boxes, and 14 MVP Tables. The facility features 26 skyboxes that are suspended from the ceiling. The building has multiple tenants